Font Size:
Share

III. Member Assuming Ownership or Operational Control of an Existing Interconnected Member Generator System

Complete Sections A, B, C, D, F, G and H attaching all required documents, diagrams, et cetera as required by the applicable section(s) of this Application and Agreement and return to Cooperative for review and final approval of the Cooperative (Section I).